Tesla hired over 1,000 factory workers for its Semi program in NV: report

THE STORY
More stories ↓

[ad_1]

Tesla revealed some new Semi fleet data, as well as a new feature the truck will have, and expanded on plans for infrastructure at the ACT Expo today in Los Angeles.

The Tesla Semi is one of the company’s most anticipated releases, and although it has already made its way into several company fleets, other companies are waiting for the automaker to fulfill their orders.

Tesla recently reaffirmed its mass production date of late 2025, hoping to build 50,000 Semi units annually at a new factory in Reno, Nevada.

At the ACT Expo, Tesla revealed some new details about the truck, including current fleet data, a new feature that will be a big selling point for many companies interested in the vehicle, and future infrastructure plans.

Fleet Data

Tesla has already accumulated over 7.9 million miles across its test fleet, the company said at the event. This includes 26 vehicles with over 100,000 miles on them, an impressive feat considering they are only taking regional runs, as of now.

The most notable companies with the vehicle are PepsiCo. and Frito Lay, both of which have spoken highly of the Semi’s ability to handle longer days. Drivers have reported that the Semi has helped them complete 1,000-mile travel days.

The first phase of production units will be integrated into Tesla’s logistics operations for real-world testing, which is something that has already been done.

Customer deliveries are expected to begin next year, something that was reiterated during the company’s most recent earnings call.

Tesla Semi’s New Feature

The semi will equip a 25-kilowatt electric Power Take-Off system that will help companies power auxiliary features like refrigeration, hydraulic systems, compressors, and more.

This is a massive feature, especially for companies that will be transporting perishable goods using the Semi. This will become especially important as it starts making cross-country runs and more companies begin taking delivery of the vehicle as production ramps up.

Expansion to Public and Private Charging Infrastructure

The Semi utilizes the Megacharger for its charging needs, and many sites have been installed already. Frito-Lay is expanding its Megacharger infrastructure by building eight new piles at its Bakersfield, California, factory.

We reported on that earlier this month:

Tesla Semi fleet from Frito-Lay gets more charging at Bakersfield factory

However, Tesla has many more megawatt-level sites that are under construction for public Semi charging: 46, to be exact.

It also said it has more fleet sites that are underway, one of them being the Bakersfield factory’s infrastructure.



[ad_2]

Source link

KEEP THE CONVERSATION GOING

Share this story.

Facebook ↗X ↗
EXPLORE MORE

Keep reading.

Explore all news ↗
Best electric kettles 2026 — gooseneck and full-size temperature control kettles on a kitchen counter
Technology

Best Electric Kettles 2026: 6 Picks for Tea, Pour-Over Coffee and Fast Boils in Canada

Read story ↗
Best water flossers 2026 — Waterpik and Philips Sonicare power flossers on a bathroom counter
Technology

Best Water Flossers 2026: 6 Picks for Healthier Gums, Braces and Travel in Canada

Read story ↗
Best UPS battery backups 2026 — UPS unit protecting a home office PC, monitor and router
Technology

Best UPS Battery Backups 2026: 6 Picks for Home Offices, Gaming PCs and Networks in Canada

Read story ↗